Greater Cairo Metro Line 3

The line crosses the River Nile twice: at the western branch (between Kit Kat and Zamalek) and the eastern branch (between Zamalek and downtown Cairo).

The line comprises 29 stations, out of which 2 will be on grade and the remaining 27 stations underground. The tunnel shall be a bored tunnel and the stations shall be executed by the cut and cover method.

Line 3 will be built in four operational phases:
 
 1    2    3    4    5